Over 40 Years in business
Tel: 905-795-8757
PROJECTS / Commercial & Institutional
DURHAM COLLEGE CAMPUS RECREATION AND WELLNESS CENTRE OSHAWA, ONTARIO.
Project Team:
Owner: | Durham College |
Architect: | Barry-Bryan Associates |
Structural Engineer: | Barry-Bryan Associates |
General Contractor: | Peak Engineering |
Steel Fabricator: | Tresman Steel Industries Ltd. |
Steel Detailer: | Tresman Steel Industries Ltd. |
Steel Erector: | Island Steel Erectors |
Project Description:
The 90,000 square foot Campus Recreation and Wellness Centre expansion opened in June 2007. It offers a 28,000 square-foot triple gymnasium with areas for volleyball, basketball and badminton, a 10,000 square-foot fitness centre, and an outstanding Campus Health Centre.
Tresman Steel supplied and installed 500 tons of structural steel and joist for this project. A majority of the steel was dedicated to new construction adjacent to the existing recreation facility. A smaller portion of the work was inside the existing facility where reinforcing was required.
Tresman Steel supplied and installed 500 tons of structural steel and joist for this project. A majority of the steel was dedicated to new construction adjacent to the existing recreation facility. A smaller portion of the work was inside the existing facility where reinforcing was required.